
Houston-based Triten Real Estate Partners has broken ground on a speculative industrial project in Southwest Houston, putting up two Class A buildings on an 18-acre site near Fort Bend County that are designed for small-bay tenants the company says have been largely passed over by recent development. The Southwest Houston Industrial Center sits at 12911 Zavalla Street, just off Beltway 8, and is expected to be finished by summer 2027.
Two Buildings, Two Different Tenant Types
According to Realty News Report, the project will deliver two buildings totaling 172,889 square feet, though a separate account from Bisnow describes it as a 173,000-square-foot development — the two outlets differ slightly on the exact combined figure. Building 1 comes in at 75,192 square feet and is built as a rear-load facility, according to Bisnow. Realty News Report describes it as serving businesses that need warehouse space paired with a customer-facing storefront. Building 2 is a 96,967-square-foot front-load building aimed squarely at distribution, fulfillment and last-mile operations, the outlet reports.
Leasing for the project is being handled by Garret Geaccone, Heath Donica and Danielle Rothchild of Stream Realty Partners, according to the same Realty News Report account. Southside Bank is providing construction financing, and the project team includes Angler Construction as general contractor, Graywolf as civil engineer and Method Architecture as architect, the outlet notes.
Why Triten Is Betting On Small-Bay Tenants
Triten, founded in 2011, said proximity to rooftops is becoming just as important to industrial site selection as proximity to highways — a signal of how population growth around Houston's edges is reshaping where developers choose to build, per Realty News Report's reporting. Triten Managing Partner Will Hedges put it more bluntly in comments carried by the same outlet: “Small-bay users have largely been overlooked by recent development, and we saw an opportunity to create something specifically for them.”
The bet comes as Southwest Houston's industrial submarket is already showing strength. The submarket posted 1.5 million square feet of net absorption in the third quarter of 2026, according to a Lee & Associates market report, and the Southwest and Far West submarkets recorded the metro's highest weighted asking rates that quarter, at 74 cents per square foot. The same report found direct industrial vacancy across Houston fell from 6.4 percent in the second quarter of 2026 to 5.2 percent in the third, while leasing activity hit a record 10.4 million square feet for the quarter.
A Broader Houston Building Wave
Triten's project is landing amid a wider industrial construction push across the metro. Houston recorded 5.4 million square feet of industrial absorption in the third quarter of 2026, 15 percent above the 10-year quarterly average, according to a separate Bisnow report on the broader market. That report put the city's industrial construction pipeline at 20.7 million square feet, calling it the country's second-largest, while the Lee & Associates report cited a separate figure of roughly 13.5 million square feet under construction — the two figures appear to reflect different scopes or timeframes rather than measuring the identical pipeline.
Other developers are chasing similar demand elsewhere in the metro. The Real Deal describes AeroPoint 1960 as a planned 457,000-square-foot manufacturing and crane-served campus in North Houston and says a second phase is planned to add another 255,000 square feet for potential build-to-suit projects. RevKo Commercial Real Estate has broken ground on Phase 1, with five buildings totaling 202,000 square feet slated for delivery in the third quarter of 2027, according to a November 10 Bisnow report. Meanwhile, MetLife Investment Management and Panattoni Development Co. are building a 450,000-square-foot second phase at Enterprise Park at Twinwood in Brookshire, the Bisnow market report notes.
Not every developer is finding it easy to get projects financed, however. A separate Bisnow report found that difficulty securing equity is constraining Houston's industrial supply pipeline, even as demand for space remains strong — a dynamic that underscores why Triten's speculative project, which has construction financing from Southside Bank, stands out in the current market.









