Orlando

Road Closures Scheduled in Casselberry for Duke Energy Grid Upgrades from Nov 7-14

AI Assisted Icon
Published on November 04, 2024
Road Closures Scheduled in Casselberry for Duke Energy Grid Upgrades from Nov 7-14Source: Google Street View

Drivers and residents around Triplet Lake and Sunset Drives should prepare for temporary inconveniences as Duke Energy embarks on infrastructure upgrades. The company has announced plans to replace the existing main line with new concrete poles, a project that will necessitate road closures in the area from November 7 through November 14. According to the City of Casselberry's official announcement, these closures will be in effect between 8 a.m. and 5 p.m. daily throughout the duration of the work.

The infrastructure upgrade is part of ongoing efforts to ensure the reliability and safety of the power grid. Replacing the old poles with new concrete ones is seen as a crucial step in fortifying the local energy framework against future wear and adverse weather conditions.

For residents with concerns or in need of further details surrounding the project's impact, Eric Brown of Duke Energy can be contacted at 407-262-7725, Ext. 1227.

Orlando-Transportation & Infrastructure