Denver

Colorado Springs Braces for Traffic Delays Due to Key Bridge Maintenance Starting March 19

AI Assisted Icon
Published on March 17, 2025
Colorado Springs Braces for Traffic Delays Due to Key Bridge Maintenance Starting March 19Source: City of Colorado Springs

Residents and commuters in Colorado Springs should brace for traffic disruptions starting March 19, as the City has announced maintenance work on two key bridges. The work, which consists of waterproofing, pavement replacement, and repairs, is slated to last until April 11, according to the City of Colorado Springs.

The Cresta Road bridge, spanning Cheyenne Creek south of Cheyenne Road, will retain one lane open in each direction throughout the project. Meanwhile, the Cheyenne Road bridge, situated a mere 200 feet west of Cresta Road, will be reduced to one lane with flaggers directing traffic. This proximity of work zones, well, suggests that drivers in the area will likely face notable delays.

This maintenance is not just a temporary inconvenience, it's an investment in the infrastructure's future. As noted by the City of Colorado Springs, "The work should extend the service life of the bridges and limit future repairs and road closures." By addressing these issues now, the City aims to save on more extensive and expensive repairs down the line.

Moreover, this isn't merely a matter of upkeep, the timing is strategic. By concluding the efforts before this summer's 2C repaving project and well in advance of the 2025 United States Senior Open at The Broadmoor, the City appears to be streamlining its infrastructure to accommodate the forthcoming flux of traffic. For those planning their commutes, or even a simple trip across town, the advice remains, build in extra time or find another route, if possible, during this season of refurbishment.

Denver-Transportation & Infrastructure