Denver

Englewood's South Broadway Set for Closures Due to Lead Pipe Replacement Project

AI Assisted Icon
Published on June 11, 2025
Englewood's South Broadway Set for Closures Due to Lead Pipe Replacement ProjectGoogle Street View

Residents and commuters who frequent South Broadway should brace for a series of closures starting from mid-June to early-July, as Englewood Utilities embarks on a project to replace the old lead water lines with new copper piping, aiming to ensure the safety of the drinking water. According to the City of Englewood, the utility work will prompt full closure of southbound traffic on South Broadway, which will be redirected to Bannock Street during the operational hours of 7 a.m. to 5:30 p.m., while the northbound lanes will be constricted but not fully closed, maintaining a single lane open to traffic.

While the news may agitate those who depend on this thoroughfare for their daily commute, the closures are estimated to last only two days per section, which, despite its undoubted inconvenience, is a small price to pay for the enhancement of public health and environmental safety. As crews work diligently to replace the problematic lead pipes, which have served well past their prime, disruptions in front of local properties are expected to endure between one to two days, signaling a significant overhaul that portends a cleaner, safer water system.

The aftereffect of the pipe replacement will necessitate a return visit from the crews for road patching, ensuring a smooth transition from construction upheaval to the new status quo. The City has expressed gratitude in advance for the patience of its citizens, recommending that they plan and consider alternate routes to avoid the expected congestion and delays. For the interim, Bannock Street will bear the brunt of the redirected traffic, hosting urban voyagers in their daily dance from point A to point B.

Denver-Transportation & Infrastructure