Tampa

Traffic Alert, Lane Closures on Peachland Boulevard in Charlotte County from Aug. 27-29 for Power Line Installation

AI Assisted Icon
Published on August 27, 2025
Traffic Alert, Lane Closures on Peachland Boulevard in Charlotte County from Aug. 27-29 for Power Line InstallationSource: Unsplash/Jon Tyson

For those planning on navigating the roadways of Peachland Boulevard, be prepared for slowdowns. Beginning today and running through Friday, there will be intermittent lane closures from Harbor Boulevard to Birchcrest Boulevard, according to a Charlotte County advisory. The disruptions, scheduled between 8 a.m. and 5 p.m., are due to Irby Construction's work to install underground power lines.

Commuters should anticipate delays and plan their schedules accordingly, as the construction activity is expected to impact traffic flow; the county suggests allowing additional time for travel through the affected stretch. Detour routes will be clearly marked, providing guidance around the construction zone, traffic patterns may be affected differently from day-to-day as work progresses on the underground infrastructure project.

Charlotte County's Public Works Department urges drivers to exercise caution and stay aware when passing through the area of operation. This level of heightened vigilance is essential for ensuring the safety of both the road users and the construction crew during these necessary upgrades to the city's power system.

Updates on the traffic situation and any potential changes to the schedule or scope of the roadwork will be provided by the county, so those affected are encouraged to periodically check in for the latest news.

Tampa-Transportation & Infrastructure