
A massive new food storage and distribution facility rising for Aurora Public Schools has hit the halfway point in construction, with crews finishing the building's foundations and now racing to seal up its freezer and cooler sections before winter work intensifies. The 54,000-square-foot project is meant to become the central hub feeding tens of thousands of students across dozens of campuses for decades to come.
A Warehouse Built Around Refrigeration
Brinkmann Constructors is the contractor behind the facility, according to The Business Journals, which reports the building will provide roughly 51,000 square feet of food storage space out of its 54,000-square-foot footprint. About 75% of that area is dedicated to refrigerated and frozen food, with the remainder set aside for dry storage and offices for APS Nutrition Services staff, per the same report. All told, the facility is designed to hold more than 1.5 million cubic feet of inventory.
The outlet reports the warehouse will serve as the central distribution hub for 65 schools serving 38,000 students, a figure that differs from the roughly 40,000 students that Rocky Mountain PBS has reported the district's broader nutrition operation serves districtwide. The building itself is split architecturally: RTA Architects, the project's architecture firm, describes an 11,740-square-foot precast concrete warehouse and administration section alongside a 41,652-square-foot insulated metal area built for freezers, coolers and loading docks.
Freezer Construction Is the Hard Part
Crews have completed all foundations and structural slabs, including the specialized freezer topping slabs, and have erected precast walls and roof members in the dry-storage and office sections, the Business Journals reports. In the refrigerated areas, roughly half of the rack-supported structure and its insulated metal panels are now in place, and mechanical, electrical and plumbing rough-ins have begun inside the freezer and cooler zones.
That rack-supported design is not just a construction shortcut. RTA Architects describes it as an innovative system built for economy and efficiency, in which structural racking itself supports the insulated metal wall and roof panels rather than relying on a separate building frame. The architecture firm also notes the rack storage is sized to meet the district's projected needs over the next 30 years, with extra space built in that could be rented out to nearby districts.
What Comes Next on Site
Work in the coming months will focus on finishing the structural racking and insulated metal wall and roof panels in the cooler and freezer sections, along with the remaining roofing and enclosure work needed to make the building weather tight, according to the Business Journals' reporting. Mechanical and refrigeration systems are slated for installation and commissioning during the second half of construction. Once finished, the facility is expected to include 12 fully equipped loading docks and storage racking reaching 30 feet high.
The project marks Brinkmann Constructors' first partnership with Aurora Public Schools, and the contractor has been coordinating with the district, the architect, a structural engineer, a refrigeration consultant, vendors and trade partners throughout the build, the outlet reports. Brinkmann has said the project will provide infrastructure for a food distribution program supporting APS students, staff and schools for decades, with the goal of letting the district maintain larger inventories, consolidate products centrally and streamline deliveries to individual schools.
Part of a Broader Push to Expand Food Capacity
The new hub fits into a wider pattern of growth in APS's nutrition operations. Rocky Mountain PBS has reported that the district is building a larger warehouse near Airport Boulevard specifically to make room for more local produce sourced from farmers across Colorado, part of a broader effort to deepen partnerships with local producers. The district's central kitchen already prepares cold meals, sauces and desserts daily for distribution across its schools, according to the same report.
That expansion follows years of strain on the district's food operations. Sentinel Colorado reported that APS Nutrition Services distributed roughly 8 million meals from March 2020 onward during the pandemic, relying on 16 meal drop-off locations set up to reach families. More recently, Rocky Mountain PBS noted that meals at APS schools have been free to students since the 2023-24 school year under the state's Healthy School Meals for All initiative, adding further pressure on the district's storage and distribution capacity.
Aurora has also seen similar cold-storage investment beyond the school district. Food Bank of the Rockies completed its own 58,000-square-foot cooler and freezer facility in the city in June 2025, according to Building Enclosure. That facility includes 20,000 square feet of freezer space and 30,000 square feet of cooler space, each rising 29 feet tall, with 17 high-speed roll-up doors and solar power designed to meet all of the building's energy needs, the trade publication reported.









