
A developer's plan to build 275 apartments on 15 wooded acres along Duraleigh Road in Raleigh has neighbors worried about what construction could send downhill into Crabtree Creek. Atlanta-based Portman Holdings is seeking to rezone the site at 5000 Duraleigh Road for a three-building complex, and residents say the sloped, forested parcel sits too close to a waterway already struggling with pollution.
According to the Raleigh News & Observer, the land is currently owned by Heidelberg Materials, a stone, gravel and sand supplier that also owns the quarry directly west of Duraleigh Road. The rezoning request, detailed in a case record filed with the city, covers approximately 15.34 acres located about 900 feet south of the intersection of Weaver Drive and Duraleigh Road, according to the Raleigh rezoning case record. The request would shift the zoning from Residential-4 to Residential Mixed Use-5 Stories-Conditional Use, limiting the property to residential and accessory uses with apartments as the only permitted building type, and keeping apartment buildings at least 100 feet from the northern property line.
Neighbors Fear Runoff and Buried Chemicals
Denis Allen, who lives on nearby Oak Park Road, called the plans unsuitable and said the property slopes toward Crabtree Creek, meaning rainwater could carry construction materials and development debris downhill into the water, the News & Observer's report notes. The creek is already classified as impaired by the N.C. Department of Environmental Quality because it fails to meet certain federal water-quality standards, per the same outlet's reporting.
Allen also raised concerns rooted in the site's industrial past. He said the property was previously used for an asphalt plant and testing lab that closed in the 1970s, and he suggested the operation may have leaked potentially harmful chemicals into the ground, according to the News & Observer. Allen separately told the paper he believes the site likely sits atop an underground rock shelf that could require blasting during construction. Neighbors have also voiced concerns about squeezing site access onto Duraleigh Road and the added traffic a 275-unit complex would bring, the outlet reported.
More Than 100 Volunteers Join Opposition
Allen said more than 100 people have signed up to volunteer through a website connected to the rezoning case, and neighbors have signed a petition opposing the project, per the News & Observer's account. He said he fears the Raleigh City Council will ultimately approve the rezoning anyway, and that he personally would prefer to see the land preserved rather than developed.
The developers have already held two neighborhood meetings — the first, a city-mandated session, took place on July 14, 2026, according to a notice posted by the City of Raleigh. Portman Holdings' counsel then invited neighbors to a second, voluntary meeting on September 9, 2026, at the Laurel Hills Community Center to gather additional public input, the same notice shows. Under the city's rezoning rules, an applicant must hold a neighborhood meeting and attend a pre-application conference before filing a rezoning request, according to Raleighnc.gov. The News & Observer reports the developers still need to hold one more neighborhood meeting before the request can move forward, after which the Raleigh Planning Commission will make a recommendation to the City Council, which holds ultimate authority over the rezoning decision.
A Familiar Fight Near the Same Creek
This isn't the first time apartment plans near this stretch of Crabtree Creek have drawn pushback. Six years before this proposal, neighbors opposed a development of almost 400 apartments just south of the creek and the current Duraleigh Road site, the News & Observer's reporting notes. The Raleigh Parks Foundation, which owns the nearby Azalea Falls property, initially opposed that earlier project — which raised concerns about effects on Azalea Falls — but withdrew its opposition after environmental safeguards were added, and the development was later completed as MAA Vale.
A separate, earlier rezoning on Duraleigh property followed a similar arc: the City Council approved up to 369 residential units where only 158 had previously been allowed by right, according to the News & Observer's coverage of that case. At the time, the City of Oaks Foundation said it had withdrawn its opposition to that rezoning in exchange for additional protections for Azalea Falls. The News & Observer reported that Portman Holdings did not respond to a contact attempt made the Tuesday before this story published, and the Raleigh Parks Foundation also did not respond to an inquiry about its current position on the new proposal.
Rezoning Fits a Broader Housing Push
The Duraleigh Road debate is unfolding as Raleigh has pursued allowing more and denser housing citywide in an effort to bring down costs. Between 2021 and 2024, Raleigh produced 16,884 housing units, adding 7.7% to its housing stock, according to a study from the Pew Research Center. The city issued an average of 5,731 new housing permits annually over that period, a 74% jump from its 2017-to-2020 average, and townhouse permits more than doubled compared with the 2015-to-2020 period, the Pew study found.
That building boom coincided with falling rents and a growing population. Inflation-adjusted rents in Raleigh dropped 15% from 2022 to 2025, per Pew's analysis, even as the city added roughly 31,000 residents over the same stretch — a population increase of 6.5%. For neighbors along Oak Park Road and Duraleigh Road, that citywide trend offers little comfort if it means more construction cutting into the wooded slope above Crabtree Creek.









