Tampa/ Real Estate & Development

East Ybor's $88M Recycling Plant Set for Steel-Raising Ceremony, Mayor Castor to Attend

AI Assisted Icon
Published on November 26, 2026
East Ybor's $88M Recycling Plant Set for Steel-Raising Ceremony, Mayor Castor to AttendSource: City of Tampa / Wikimedia Commons

WM is ready to start raising steel beams at its $88 million recycling plant in East Ybor City, with a ceremony planned for next Wednesday, Dec. 2, at 10 a.m. at the construction site on North 35th Street. Tampa Mayor Jane Castor and WM Florida Area Vice President David Myhan are both scheduled to attend, and weather permitting, crews plan to hoist a signed beam into place to mark the occasion.

The company's announcement, as reported by the Business Observer, comes after WM began work on the larger materials recovery facility earlier this year. According to Tampa Bay Business & Wealth, the project is planned for an 11-acre site at 1600 N 35th St., with construction expected to begin in spring 2026 and the facility targeted to open in late 2027.

What the New Facility Will Look Like

The new plant will span roughly 110,000 square feet, built right next to WM's existing material recovery facility, which handled about 90,000 tons of material in 2023, per the Business Observer's reporting. The existing building is expected to remain on the property even after the new plant opens, though WM has not finalized what it will become. Tampa Bay Business & Wealth reports that possibilities include converting it into a construction-and-demolition recycling facility, a transfer station, or demolishing it altogether.

A Florida Department of Environmental Protection report had described the existing facility's infrastructure as aging, according to the same report. Once the new plant opens, it is expected to take over recycling operations from its neighboring predecessor, processing recyclables collected from Tampa neighborhoods and across Hillsborough County.

Sorting Technology and Processing Capacity

The new facility is set to include two processing line systems and 17 optical sorters, built by San Diego-based CP Group, which makes the plant's processing equipment. WM says the plant will lean on emerging recycling technologies to separate materials more efficiently, with recyclable materials eventually baled and sold to manufacturers that use them to make new products.

How much material the plant can handle depends on which account you read. Tampa Bay Business & Wealth reported the facility is designed to process approximately 220,000 tons of recyclables per year, operating at about 50 tons per hour on a dual-line system, while CP Group's own description put the figure at a 228,000-ton annual processing capacity, also citing up to 50 tons per hour. Either way, the plant represents a significant leap from the roughly 90,000 tons the current facility handles annually.

A County Contract and a Bigger Company Push

Gilbane Building Co., a general contractor based in Providence, Rhode Island, is overseeing construction. The project is tied to a 15-year processing contract WM signed with Hillsborough County, which includes two five-year extension options. Hillsborough County, in a notice about the upcoming ceremony, described the steel-raising event as marking construction of a new recycling facility that will benefit the county, which it called WM's primary customer, according to the Hillsborough County government.

The East Ybor project is part of a broader recycling facility investment effort WM launched in 2022. The company, headquartered in Houston, Texas, and formerly known as Waste Management Inc., plans to invest more than $1.4 billion to build or upgrade 39 recycling facilities across North America by the end of 2027. WM describes itself as North America's largest waste collection and environmental solutions company, serving residential, commercial, industrial and municipal customers across the U.S. and Canada, and it reported $25.2 billion in operating revenue in 2025, a 14.2% increase from the prior year.

How It Compares to WM's Florida Investments

Tampa's project follows a similar buildout in South Florida, where WM's $90 million Pembroke Pines recycling plant opened to the public earlier this year. That 127,000-square-foot facility, which held a ribbon-cutting on Feb. 19, is expected to recycle up to 275,000 tons of material annually and serves Broward, Miami-Dade, Monroe and Collier counties, according to the South Florida Sun Sentinel. That plant relies on magnets and AI-powered optical screens to sort aluminum, tin, fibers, cardboard and plastics, similar technology to what's planned for the East Ybor site.

WM's capacity estimates for its broader investment push also vary depending on the source. Waste Advantage Magazine reported the company expected its planned investments to add approximately 2.8 million tons of incremental annual processing capacity by the end of 2026, while Resource Recycling reported WM estimated its annual recycling capacity would increase by 1.8 million tons by 2027. WM has said separately that it invested $1.4 billion into recycling infrastructure since 2022, and that automation across its facilities is expected to cut labor required per ton by up to 35%, according to Resource Recycling.

For now, the upcoming milestone in East Ybor is a physical one: a steel beam is scheduled to be raised at a site that's been under construction since earlier this year, with roughly a year still to go before the plant is expected to open and begin processing Tampa Bay's recyclables at a far larger scale than the aging facility next door.

Tampa-Real Estate & Development