
The Enterprise Rent-A-Car branch at 453 Third Avenue in Gowanus is slated to be replaced by apartments, according to a new development filing for the corner site at Third Avenue and Ninth Street. The filing calls for 49 residential units, a green roof and 25 bicycle spaces on a lot currently occupied by the car rental outpost.
What's Planned for the Corner Lot
The proposal, first reported by The Business Journals, would bring new housing to a site that has functioned as a rental-car branch for years. The site itself is a 106.5-by-80-foot corner lot on the northeast corner of Third Avenue and Ninth Street, according to a listing from Avison Young. That same listing describes the property as currently improved by a 1,540-square-foot retail building leased to Enterprise Rent-A-Car through June 2027.
Zoning details from the brokerage give a sense of just how much building the lot could support. The parcel is zoned R6A (C2-4), the listing notes, with a residential floor-area ratio of 3.0 that would allow 25,600 buildable square feet — or up to 33,228 buildable square feet, a 3.9 FAR, if a Universal Affordability Preference housing bonus is applied.
A Neighborhood Already Mid-Transformation
The 453 Third Avenue proposal lands in a Gowanus housing pipeline that's already crowded. As of May 2025, real estate analytics firm Marketproof was tracking 141 residential projects across the neighborhood, with 44 having received a temporary or full certificate of occupancy and the remaining 97 still in pre-construction or under construction, per the firm's data cited by Brick Underground. The same report estimated roughly 6,700 units were in the pipeline without a certificate of occupancy yet, alongside about 3,100 units already in completed or near-completed buildings.
That construction boom traces back to the November 2021 rezoning of 82 Gowanus blocks, though sources differ on exactly how much housing it will ultimately produce. Brick Underground has reported the rezoning was expected to create 8,500 new housing units, including 3,000 designated as affordable, while CityRealty has put the number at approximately 7,000 new units enabled by the rezoning and subsequent approvals. The rezoning also allowed mixed-use towers as tall as 30 stories near the Gowanus Canal and 17 stories along Fourth Avenue, according to CityRealty.
Rents in the neighborhood's newer stock reflect that shift. Buildings constructed in 2018 or later command a 35 percent premium over older Gowanus properties, with an average rent of $77.42 per square foot, according to an expert quoted by Brick Underground.
Other Projects Reshaping the Blocks Nearby
The Enterprise site isn't the only former auto-oriented property giving way to housing in Gowanus. At 424 Hoyt Street, developer Ailanthus has filed plans for a 17-story, 400-unit residential building on a site that previously held a car repair shop and vehicle storage facility, Hoodline reported in September. That project is expected to include between 100 and 120 affordable housing units, a notable shift from a roughly 300,000-square-foot commercial office and school project Two Trees had floated for the same site back in 2019 but never built.
Further along the Canal, the 175 Third Street tower broke ground in a ceremony held in late September, according to CityRealty. Reported unit counts for that project vary by outlet: CityRealty has described it as having more than 1,000 apartments with approximately 250 affordable, while Multi-Housing News put the figure at about 1,000 residences alongside a 37,000-square-foot publicly accessible waterfront esplanade. Hoodline's own coverage of the broader Gowanus pipeline has described 175 Third Street as a 1,100-unit mixed-use development with a quarter of its units designated affordable.
Taken together, the filings suggest Gowanus's transformation from industrial and auto-service corridor to residential neighborhood is continuing apace, with the Enterprise lot representing a much smaller but still telling piece of that shift. Whether the 453 Third Avenue plan secures permits or financing, and when construction might begin, remains to be seen.









