
The Scotlandville Branch of the East Baton Rouge Parish Library at 7373 Scenic Highway has reopened after years of construction, giving the community a bigger children's room, a dedicated teen space, separate study rooms and a community room that seats up to 120 people. The library also now houses a Black Heritage area and what the library has described as the first maker space among its community branches.
According to the East Baton Rouge Parish Library's September 2026 newsletter, the project moved in two phases, starting in 2023 with a separate archives annex and maintenance building before the library's own expansion and renovation phase began in 2025. The newsletter put the renovated branch at 24,059 square feet, more than 6,000 square feet larger than the original 2001 building, while separate East Baton Rouge Parish Library project materials for the groundbreaking listed the renovated branch at 24,226 square feet, an increase of 6,241 square feet — figures that differ depending on which library document is consulted.
Funding for the work also has conflicting figures depending on the source and timeframe. Library project materials put Phase II's total budget at $8.8 million, including $7.02 million earmarked for construction, financed through the library's dedicated property tax without any bonds or added debt. That $8.8 million figure for the renovation was echoed by brweeklypress.com. An earlier November 2023 report from [225] had described the planned renovation as a $10.8 million project expected to wrap up in late 2024, a different figure and timeline than what the library's later Phase II materials reflect.
What's New Inside the Branch
Per the library's newsletter, the renovated Children's Room now includes interactive technology and tactile learning opportunities, while teens have their own dedicated room with easy access to collaborative work and study rooms. The newsletter also describes a Makerspace and a conference room among the new additions. The expanded meeting room, which can be divided into two separate spaces, can accommodate up to 120 attendees.
As reported by The Advocate, community members had asked for study rooms, a large meeting room, updated technology and vending machines, and wanted a modern, welcoming space where everyone felt they belonged. Lauren Jung told the paper that the community got basically what they asked for. The Advocate also reported that the branch now includes a refreshments area with vending machines and that its maker space features 3D printing, a Cricut machine, a sewing machine and a heat press — amenities the paper described as making Scotlandville the first community library to receive a maker space.
A Library That Feels Different to Use
Jaylan Johnson told The Advocate that the renovated library feels more spacious and open, and that the bathrooms are easier to access than before. According to that same report, the former restrooms were located around a corner and felt more isolated, which Johnson said had made her feel unsafe. Johnson also told the paper that libraries provide literacy, internet access and other resources to children who may not have them at home.
The Advocate's account also details the exterior work: improved courtyards, including one suited for outdoor events, along with new bike racks, a bike repair station and a garden story walk. The outlet reported that the first construction phase began with a 6,640-square-foot archives annex, that library staff moved temporarily into that annex in November 2024, and that renovation of the main library building began in April 2025. Library workers then moved into the finished space after 16 months of construction, spending three days preparing the renovated branch before it reopened to the public.
A Mural Rooted in Louisiana History
The library is also creating a Black Heritage room dedicated to research on local historical figures and special collections, according to The Advocate. That space includes the Willie Harris Collection, honoring Harris, who served as Southern University's first chief of police and worked as a professional photographer documenting life at the university and throughout Scotlandville, per the same report.
Above the Black Heritage room hangs a large mural by Randell Henry, a Southern University art professor, based on his own collage depicting the 1811 slave rebellion that began in Louisiana's river parishes and moved toward New Orleans, The Advocate reported. Henry, who began making art in sixth grade, told the paper that the mural depicts an event that really happened in history, and said libraries had inspired him to become an artist himself.
The East Baton Rouge Parish Library's own newsletter notes that the mural above the branch's entrance is based on work by Henry, described there simply as a local artist and Southern University professor. The Advocate's story was reported and written by a student with support from the Louisiana Collegiate News Collective, an LSU-led coalition of eight universities that the paper said is funded by the Henry Luce Foundation and the John D. and Catherine T. MacArthur Foundation.









