Greater Tulsa/ Tulsa/ Real Estate & Development

Tulsa Tech's Midtown Campus Adds Building; Permit Lists $83.7M Value

AI Assisted Icon
Published on November 25, 2026
Tulsa Tech's Midtown Campus Adds Building; Permit Lists $83.7M ValueTulsa Tech Owasso Campus — Comparison Campus for New Building
Google Street View

Tulsa Technology Center at 3420 S. Memorial Drive is adding a new office, classroom and lab building, with construction already underway and pictured on campus this summer. The project marks the latest step in a years-long effort to modernize the school's flagship midtown campus, bringing new space for hands-on training programs to a site that has steadily been rebuilt piece by piece.

According to a report from Tulsa World, construction at the campus was pictured this summer as crews worked on the new facility. A City of Tulsa permit dated Oct. 20, as relayed by Morning Line Leads, lists a value of $83.7 million; the permit is for the new office, classroom and lab building at the Lemley Memorial Campus address.

The new building is officially known as the Career Education Center, and it's planned to cover nearly 350,000 square feet once finished, according to GH2. The outlet reports the center will combine classrooms and labs with the school's existing programs, and that the project is expected to be completed in time for the beginning of the 2028-29 academic year.

Part of a Larger $122 Million Campus Overhaul

The new building isn't a standalone project. Tulsa Tech announced construction on what GH2's report described as the final phase of a $122 million redesign of its midtown campus. The goal, per the same report, is to bring programs like advanced manufacturing, construction trades and information technology to a more centralized location on campus.

This phase follows two earlier builds at the same site. The Industry Training Center opened in 2018 and the Client Service Center followed in 2021, the first two phases of the campus rebuild, the Morning Line Leads report notes. Those two projects set the stage for consolidating Tulsa Tech's sprawling program offerings into fewer, larger facilities.

Construction Disrupts Campus Access

The ongoing work has already changed how people move around the Lemley campus. Tulsa Tech has closed a walkway and two blocks of parking around the construction site as crews build the new classroom building, the same report states. The disruption reflects the scale of the project, which sits on a campus still serving students and staff during the buildout.

How the New Building Compares

The scope of the Career Education Center echoes other recent Tulsa Tech construction. Crossland Construction built a 238,000-square-foot facility serving the school's Owasso Campus, a four-story building that includes classrooms, labs, student services and administrative space, according to the Crossland Construction project page.

The Lemley campus itself has grown through similarly sized additions. The Client Service Center, a 170,000-square-foot facility, brings student services, workforce training and administrative operations together in one building, according to Wallace Design Collective. That project also included a 672-space parking lot with 10 ADA-accessible van spaces and 662 standard spaces, per the same design firm's account.

The timing of Tulsa Tech's expansion lines up with a broader uptick in institutional construction planning. Dodge Construction Network's planning index for institutional projects rose 9.4% from August to September, with education cited as one of the drivers behind the increase, according to the Morning Line Leads report. For now, the Career Education Center remains under construction, with Tulsa Tech aiming to welcome students into the finished space in time for the 2028-29 school year.