New York City/ Real Estate & Development

Williamsburg Lot Near Marcy Avenue Station Eyed for Four-Story Rental Building

AI Assisted Icon
Published on November 21, 2026
Williamsburg Lot Near Marcy Avenue Station Eyed for Four-Story Rental BuildingMarcy Avenue Station — Nearby Subway Station Serving Project
Google Street View

A one-story building on South 2nd Street in Williamsburg could soon make way for a four-story residential building with eight apartments, according to permits recently filed for the site. The lot sits between Marcy Avenue and Havemeyer Street, just blocks from the Marcy Avenue subway station, putting any future residents within easy reach of the J, M, and Z trains.

The filings, first reported by New York YIMBY, list Richard Pogostin, who is associated with Broadway Industrial, as the owner behind the applications. The proposed building would rise 38 feet and yield 5,463 square feet of residential space, with Shahin Badaly of Badaly Engineering PLLC listed as architect of record, per the same outlet's report.

What the Plans Call For

The eight residences would average 682 square feet apiece, a unit size that, according to the filing details, suggests the building is likely to be rentals rather than condos. The proposed structure would be masonry-based and include a penthouse along with a 37-foot-long rear yard, the filing documents show.

Property records offer some context on what currently occupies the lot. StreetEasy describes 275 South 2nd Street as a commercial building in Brooklyn that was built in 1950 and has one story and one unit. PropertyShark likewise lists the property at 2,500 square feet with a single commercial space inside.

Still Just Paperwork, For Now

The project remains in its early stages: as of publication, demolition permits for the site had not been filed, and no estimated completion date had been announced.

For now, the single-story structure described in county records remains standing at the South 2nd Street address. Whether or when it comes down will depend on steps that, according to the permit filings reported by New York YIMBY, haven't yet been taken.