Runaway Horse Brings FrontRunner To A Standstill Between Farmington And Woods Cross
FrontRunner service between Farmington and Woods Cross was delayed Saturday after UTA reported a runaway horse on the tracks, with trains held for up to 30 minutes.
Sky Harbor Takes Off As Duffy Bets Big On Phoenix Air Traffic Fix
Transportation Secretary Sean Duffy toured Phoenix Sky Harbor as the airport’s new radios, radars and electronic flight strips get tested — part of a $12.5B push to modernize ATC. Phoenix will serve as a local testbed for upgrades meant to reduce delays and prevent outages.
After Years of Noise, Aurora Panel Inches Orchard Road Sound Wall Closer to Reality
Aurora’s infrastructure committee will consider a near‑$169,000 design contract to replace a dilapidated fence along Orchard Road with a precast concrete sound wall. The vote would move a years‑old effort another step toward construction.
Lower Snake Dam Drama, Freight Shakeup Looms For Eastern Washington
WSDOT is modeling how grain, wood and fertilizer would move if the Lower Snake River dams were removed, testing rail, terminal and truck alternatives for eastern Washington.
Water Main Break Affects Operations at Cleveland Clinic Akron General, Ambulances Diverted, Appointments Canceled
A water main break disrupted operations at the Cleveland Clinic Akron General, causing ambulance diversions and cancellation of outpatient appointments. Repairs are ongoing, but the hospital continues to provide care.












