Get the latest local stories in your inbox.
Transportation & Infrastructure in ...
The site could yield up to 460 spaces and includes a playground and skate park that would need to be reworked.
The Raiders want $75 million in public room-tax money for a new elevated plaza over Lot C — and the Stadium Authority board weighs in Thursday.
Truck traffic on Sellers Avenue is part of the problem Sellersburg is addressing.
The Single-Point Urban Interchange at 5600 South now handles roughly 100,000 vehicles a day near Hill Air Force Base.
The span will run alongside the existing Walnut Creek Bridge, linking cyclists and walkers to the trail system below without crossing traffic lanes.
Wake Forest or Rolesville will host the county's seventh DMV office, with 10 examiners and a 2027 target opening.
Two bridges linking I-84 to I-684 in Southeast won't be done until the end of 2028. The interchange handles roughly 75,000 vehicles a day.
A signal problem near Carroll Street forced F trains onto D tracks and cut G service short, snarling Brooklyn-Manhattan commutes Monday morning.
The $20 million plan follows a 2017 crosswalk death and years of merchant pushback along the corridor.
A snapped utility pole near Main Street left roughly a third of Ashland City in the dark before Cumberland Electric crews restored service.
An Oviedo resident wants his city's eight license plate cameras gone, calling the surveillance system an assumption of guilt.
Realife Cooperative residents say buses passing 50 feet from their windows could tank their home values and their peace.
Excavators are reinforcing Second Creek's banks near UT's Tickle Engineering Building, work tied to a pedestrian underpass that collapsed years ago.
Newsletter Signup
Enter your email, choose one or more newsletters, and we will only send updates for the metros you select.
* indicates required
Select at least one newsletter.