Phoenix/ Retail & Industry

Dallas Firm Divcon Quadruples Irving Plant to Feed Data Center Boom

AI Assisted Icon
Published on November 20, 2026
Dallas Firm Divcon Quadruples Irving Plant to Feed Data Center BoomSource: İsmail Enes Ayhan / Unsplash

Divcon is pouring 30,000 square feet of new manufacturing and office space into its operations, with the biggest leap happening at its Irving, Texas production facility, where the company says it is quadrupling both footprint and production capacity. The Dallas-headquartered firm, which builds mission-critical building management and electrical power monitoring systems, says the buildout is meant to keep pace with surging demand tied to the data center construction boom.

According to Business Wire, Divcon made investments across four facilities — Irving, Austin, Fargo and Tempe — as part of the expansion. In Irving, beyond the expanded production floor, the company opened a hands-on employee training facility that uses live panels and equipment to put workers through real-world scenarios.

Spreading Out Across Three States

The expansion isn't limited to Texas. Divcon says it has also grown its operations in Austin, Texas; Fargo, North Dakota; and Tempe, Arizona, according to the same Business Wire release. In Fargo specifically, the company added warehouse capacity and a smaller regional panel shop positioned near an active project base, while in the Austin and Phoenix regions it has established new regional inventory capacity to support ongoing projects.

Divcon frames the moves as a deliberate shift toward a more distributed operating model. The company says spreading inventory, panel assembly and warehousing across multiple regions can reduce transit and shipping costs, improve responsiveness to clients, and minimize potential downtime on projects, while still preserving centralized operational oversight and consistent quality and service standards across every location, per the release.

Leadership Points to Demand for Mission-Critical Controls

Divcon Chief Executive Officer and Board Chairman Marc Shiffman said the company is investing in its core operations and placing people, resources and equipment closer to the projects it supports, the release notes. Divcon Senior Vice President of Human Resources Chloe Price added that training employees directly on field systems builds technical experience and helps maintain safety and quality standards across the company's growing footprint.

The expansion lands against a backdrop of fast-rising demand for the kind of infrastructure Divcon builds controls for. A McKinsey analysis published in August 2025 found that data center demand in the United States could grow by 20 to 25 percent per year by 2030, according to mckinsey.com.

A Growing Footprint Backed by Major Capital

Divcon says it has commissioned more than 3 gigawatts of mission-critical load since 2020 and currently has over 9 million square feet of white space under management, according to the Business Wire release. The company says it will continue evaluating additional markets for future site development as demand grows.

A separate, lower-confidence project listing on zabalist.com describes a Divcon Controls renovation project at 8105 N Belt Line Rd Suite 160 in Irving as under construction, with an estimated completion date in November 2026 and an estimated value of $1.1 million; that listing has not been independently verified and offers limited detail beyond the project address and timeline.