
Guitar Shed has closed on a former church in Kirkwood, a complex that went quiet four years ago and is now set to become the music school's permanent home.
The new address is a short move, not a new neighborhood. Owner and founder Parker Smith said the property sits less than a quarter-mile from the school's current spot on Hosea L. Williams Drive. He told Urbanize Atlanta the school had wanted that church for about seven years before closing on it last week.
Longer Than the Vacancy
The complex is at 1689 Hosea L. Williams Drive SE. It housed St. Mark Church's Simply Blessed Workhouse of Faith until it closed four years ago, and it had been vacant for years. The main church building dates to 1973, Urbanize reported, citing LoopNet.
About seven years of interest, set against a complex that closed four years ago, means Guitar Shed was looking before the building shut. A contract followed in 2025.
Smith described more than a single hall: a good amount of parking, the main church, and a separate building he said is suitable for drum lessons. Conditioned space comes to 4,200 square feet, about 1,000 square feet more than the school has now. He declined to disclose the purchase price.
From One Room to the Trail
Guitar Shed was founded 11 years ago in a single room. It now teaches guitar, piano, voice, drums, violin, and other instruments where Kirkwood meets Edgewood along the Trolley Line Trail.
The school’s trail-side location sits within a broader effort to build out east Atlanta’s walking and biking connections. The city’s Eastside Trolley Line Trail project is intended to convert the historic Atlanta-Decatur trolley route into a multiuse path linking Kirkwood, Edgewood and Reynoldstown with the BeltLine and nearby parks. The city says final design work is underway, making the corridor’s future connections part of the area’s longer-term transportation plans—not just a feature of Guitar Shed’s current address. Atlanta’s trail project page outlines the planned links.
The current rooms are about two blocks west, at the Kirkwood Park commercial node, in space formerly used by Spotted Trotter and other businesses. The purchase keeps the school on Hosea L. Williams Drive and moves it out of space other businesses used first.
Smith said the lease there ends in July. He plans to move the entire operation to the church and treat it as a permanent home, rather than run two addresses.
Drums in the Parsonage
The main church building is set to host the bulk of the lessons. The former parsonage takes the specialized work: two drum rooms, one of them also planned as a small performance space.
A closed church doesn't arrive as a school. Guitar Shed is working with Kirkwood-based Stryant Construction to add a reception and waiting area, restrooms, a staff break room, parking-lot upgrades, and an accessible entrance ramp.
The ramp is more than a convenience in a renovation that will bring students and families into an older building. Federal accessibility standards cover renovations that affect how a facility can be used; when work alters areas where the main activities take place, an accessible route to those areas is generally required to the extent feasible. The standards also address routes from arrival points such as parking spaces to an accessible entrance. The ADA’s design standards provide the framework for accessibility in existing buildings and alterations.
Smith had already counted the parking as part of the draw. The ramp and the waiting area are the pieces that make a 1973 building work for weekly lessons, and the lot upgrades are how that parking gets used by a school instead of sitting with a vacant church.
Guitar Shed’s plan is part of a wider Atlanta pattern of giving former worship spaces new uses, though each project has its own scope. In Grant Park, work began on an adaptive-reuse conversion of the former Omega Holiness Church, a 1955 sanctuary on Memorial Drive. The two projects show how church buildings can remain in neighborhood use after congregations leave, with renovations tailored to a new purpose. The Grant Park project is another recent example.
A Permit, Then Next Summer
Smith said the school has a building permit and is preparing to start work soon. Renovations are scheduled to take about five months, and Guitar Shed plans to move next summer.
July is the lease date already attached to the Kirkwood Park space. Until the church renovation is finished, the lessons stay two blocks west, near the Trolley Line Trail, in the rooms the school still leases.









