New York City/ Real Estate & Development

Kingsbridge Armory Plan Adds 16-Story Green Tower With 500 Affordable Units

AI Assisted Icon
Published on November 24, 2026
Kingsbridge Armory Plan Adds 16-Story Green Tower With 500 Affordable UnitsSource: Hugo L. González / Wikimedia Commons

A 16-story residential tower designed to hold 500 affordable apartments is moving forward next to the Kingsbridge Armory, and the architects behind it just landed a state grant to make the building as green as possible. The planned tower, slated for 10 W. 195th Street and 1 W. Kingsbridge Road in the Bronx, would use high-efficiency heat pumps, recycled-glass concrete and captured waste heat from the historic armory itself, according to project details tied to the development.

The New York State Energy Research and Development Authority allocated a $150,000 grant to Aufgang Architects, the firm designing the residence, to fund research into technologies that could reduce the environmental impact of the fully and permanently affordable 500-unit building, as reported by Bronx Times. Aufgang Architects, described as a leading state architectural firm, is working alongside FXCollaborative and SCAPE on the tower's design. Ariel Aufgang said the grant enables the firm to explore sustainability approaches as a major feature of the tower's design, while Sam Lamontanaro, the firm's director of engineering, said the award creates an opportunity to consider solutions beyond conventional ones and that the team will study innovative materials and building systems to lower embodied carbon and improve efficiency.

What the Green Features Could Look Like

The research is aimed at cutting both energy use and landfill waste across the project. Plans call for recycled-glass concrete and greywater recycling, paired with high-efficiency heat pumps and energy recovery ventilation inside the units. The development team also intends to capture waste heat generated by the armory building next door, and the project team will evaluate rooftop solar panels as a way to help offset the residence's electricity use.

The tower itself is part of a broader redevelopment plan for the Kingsbridge Armory, a 1917 structure that is the country's largest armory and houses a 180,000-square-foot column-free drill hall with 120-foot ceilings. The armory was transferred to the city in 1996 and sat mostly vacant for three decades afterward, enduring nearly two decades of failed redevelopment proposals — including a mall floated in the late 2000s and an ice rink pitched in the late 2010s, both of which fizzled before construction ever began.

Council Approval and Conflicting Numbers

The New York City Council voted unanimously in October 2025 to approve land-use changes clearing the way for the redevelopment, though outlets differ on the exact date and dollar figures involved. New York YIMBY reported the vote took place on October 31, 2025, and put total funding at $216 million in city, state and federal money, while Norwood News reported the vote occurred on October 29, 2025, with a funding boost of $200 million from the same three levels of government. The housing count tied to the adjacent site also varies by outlet: City & State reported 500 affordable apartments planned for the lot, New York YIMBY cited approximately 500 units on the adjacent National Guard site with completion anticipated by 2032, News 12 Bronx reported 450 units as part of the project's second phase, and Norwood News described a proposed range of 450 to 500 affordable apartments, with a goal of half being two- and three-bedroom units.

The overall project, known as El Centro Kingsbridge or Kingsbridge Center, is expected to be completed by 2032. New York YIMBY reported that construction on the first phase is expected to begin in 2026, with completion targeted for 2030, and City & State reported that the development team, led by Maddd Equities, is working on financing and finding tenants with hopes of opening in 2030. News 12 Bronx reported the city says the project will create more than 3,000 construction jobs and 360 permanent jobs once complete.

A Community Hub Beyond Housing

The New York City Economic Development Corporation selected a joint venture of Maddd Equities and Joy Construction, together with Aufgang Architects, to lead the redevelopment. That partnership is collaborating with Our Bronx, formerly known as the Northwest Bronx Community Clergy Coalition, as it works to redevelop the armory as a community resource and economic hub alongside the adjacent affordable housing. City & State reported that other proposed uses for the armory include light manufacturing space, offices for local nonprofits and an International Salsa Museum.

Norwood News reported that the redevelopment deal includes a community benefits agreement valued at $130 million. Bronx Borough President Vanessa Gibson has expressed approval of the 500-unit residential tower, while calling for developers to reserve at least half of the apartments for families and for rents to align with the neighborhood's median income of $40,000.

Environmental Review Still Pending

Separate from the design and financing questions, the project still faces formal environmental scrutiny. According to a notice from the New York State Department of Environmental Conservation, the lead agency determined the Kingsbridge Armory project may have a significant adverse impact on the environment, meaning a Draft Environmental Impact Statement must be prepared before the plan can proceed further. The notice does not state that any significant impacts have already occurred, only that the conditional determination triggers the required review.

City & State reported that previous ideas for the massive building have not come to fruition over the past two decades, including a mall proposal killed in 2009 and an ice-rink project officially killed in 2021. With Council approval secured and a state grant now funding research into the tower's green design, the latest attempt to fill the century-old armory is further along than its predecessors — though the differing figures on housing counts, funding totals and vote dates underscore how much is still being finalized as the project heads toward construction.