Las Vegas/ Science, Tech & Medicine

Roseman Eyes Early-December Soft Groundbreaking for $70M Simulation Hub

AI Assisted Icon
Published on November 20, 2026
Roseman Eyes Early-December Soft Groundbreaking for $70M Simulation HubDiscovery Dr. & Town Center Dr. — Approximate Site of Planned Building
Google Street View

Roseman University of Health Sciences is hoping to hold a soft groundbreaking in early December for a three-story medical simulation building at its Summerlin campus, for a facility designed to train future physicians, nurses, and pharmacists side by side. The planned 84,290-square-foot structure is expected to cost between $65 million and $70 million and represents the first phase of a $500 million, three-phase expansion of the campus.

According to the Las Vegas Review-Journal, Doug Dawes hoped for a soft groundbreaking in early December. The building, once finished, will sit along Discovery Drive just off the 215 Beltway at Town Center Drive, joining Roseman's existing Discovery, Breakthrough, and Innovation buildings on campus. Renee Coffman called the project the next tangible step in Roseman's commitment to the community, describing it as the start of a $500 million expansion toward a full health care training campus, and separately called it a generational investment in the region's future health care workforce.

What the Building Will Actually Contain

Plans call for a comprehensive simulated hospital environment inside the three-story structure, including intensive care and medical-surgical patient rooms each paired with an adjoining faculty control room, along with trauma and labor-and-delivery suites and two fully equipped operating rooms. The building is also set to house an outpatient objective structured clinical examination center, specialized skills and health assessment labs, a digital anatomy lab with digital dissection and imaging tables, resuscitation quality improvement labs, and even a simulated home setting for students to practice care outside hospital walls.

Pharmacy students will get their own practice space too: a multistation retail pharmacy where they can work through patient counseling, community-based care, and everyday pharmacy workflow, the same report notes. Rounding out the building will be classrooms, student collaboration areas, faculty offices, and a third-floor rooftop garden and event space overlooking the campus and a future quad.

Breaking Down the Silos Between Disciplines

Doug Dawes, who oversees the project, framed the design around a simple idea: healthcare does not happen in silos, so students should not train in them either. As reported by the Las Vegas Review-Journal, Dawes said, “We're breaking down those walls and those silos because everything's interdisciplinary.” He also said the realistic care spaces will let students practice before encountering high-pressure situations with an actual patient.

The plan is to bring medicine, nursing, and pharmacy students together in one shared space for interprofessional collaboration, with the idea that shared training will help future physicians, nurses, and pharmacists learn to rely on one another once they reach real clinical settings. The project team includes Carpenter Sellers Del Gatto Architects and Lavallee Brensinger Architects as designers, JW Zunino Landscape Architecture leading landscape design, and Penta Building Group serving as general contractor.

A Response to Nevada's Workforce Gap

The project arrives against a backdrop of workforce strain that the same outlet's reporting lays out in stark terms: Nevada ranks 48th nationally for primary care physicians per capita and 49th for general surgeons. A Nevada Assembly member who practices medicine said the state is short of physicians, nurses, and, in that lawmaker's words, “every other medical profession you can think of.”

A 2023 report projected that Roseman's full Summerlin campus expansion would generate nearly $1.9 billion in total economic impact by 2032, support 10,624 jobs, and produce $37.5 million in tax revenue, per the Review-Journal's reporting. For comparison, Touro University Nevada already operates a medical simulation facility at its Henderson campus, according to the same outlet.

Roseman's Broader Campus Buildout

Roseman University, a private, nonprofit institution, has already invested millions of dollars purchasing Summerlin campus buildings and constructing classroom, clinical, and training space. The university added new classrooms and study spaces to Innovation Hall during the 2025-26 academic year, and construction is expected to begin in January on a new third-floor classroom in the Discovery Building. Once the simulation building is complete, the Summerlin campus is projected to reach 492,218 square feet, not counting its parking structure.

The simulation building's groundbreaking follows a milestone for the university's newest program: Roseman University College of Medicine started its MD program in 2025 and welcomed its first class of future physicians that July. The university honored 64 members of that inaugural class at its first white coat ceremony, and 15 members of that first class came from Nevada itself — a detail that speaks directly to the in-state pipeline Roseman says it is trying to build with this expansion.