More forecasts: Atlanta 30 day forecast
South San Francisco And San Bruno Cut $130 Million From Rail Fix, Send Traffic Below Tracks
May 12, 2026
A redesign of the South Linden/Scott Street grade separation cuts about $130 million, dropping the estimate to roughly $320 million and unlocking Measure A funds for engineering.
Port of Long Beach Signs Green Truck Corridor MOU
May 12, 2026
The Port of Long Beach signed an MOU with Lincoln Transportation and Wonderful Real Estate to pilot a Green Truck Corridor to the Central Valley using electric heavy trucks. The deal aims to speed the port’s move toward zero‑emissions operations.












