
The Utah Jazz, in collaboration with Smith Entertainment Group (SEG), has unveiled its plans to construct a new state-of-the-art practice facility located at the Shops at South Town in Sandy, just a convenient 18-minute drive from the Delta Center in Salt Lake City, as reported by ABC4. This development comes as part of a broader effort to create an advanced sports campus in the area, with the construction set to commence this fall season.
The new practice facility is poised to include two full-sized basketball courts ample room for a full range of team activities, a team locker room, and not just that, but also workout and training spaces equipped with the latest tools designed to optimize athletic performance, complemented by a performance kitchen and various other amenities built to bolster player development and enhance team chemistry; KSL shares details on the envisaged features. Austin Ainge, president of basketball operations, emphasized the significance of the forthcoming facility, stating, "This will be a state-of-the-art facility and a tremendous environment where our players and coaches can work, train, and develop," a sentiment captured by KSL.
In a parallel move, the Utah Mammoth recently inaugurated their expansive 146,000 square-foot practice facility at the same mall location, showcasing the rapid development of this athletic hub that houses two rinks for split-surface workouts and franchise offices, the whole project being swiftly executed from ground breaking to completion within a mere 13 months, affirming the efficiency of such ventures in the state, as outlined by Fox13.









