
A Charlotte development company wants to build a seven-story apartment tower with a rooftop pool and river views just steps from First Horizon Park, but the project still needs a key sign-off from Metro before it can move forward. Proffitt Dixon Partners is eyeing the Second Avenue property in Nashville's Germantown neighborhood for a mixed-use building called Ferra, one that would bring roughly 325 apartments and ground-level retail to a stretch of land hugging the ballpark.
The project is planned for 1000 Second Ave. N., near First Horizon Park, according to Nashvegas.com. Proffitt Dixon is seeking Metro approval for the project, and the plans call for street-level retail, a restaurant along the greenway, and a rooftop pool and amenity area with river views, per the same outlet's reporting.
The company previously acquired a former State of Tennessee parcel on Second Avenue in October 2021 for $32.53 million, according to Nashvegas.com's account, which puts the property at 5.98 acres.
Height Approval Still Pending
Proffitt Dixon sought an overall height modification from the Metro Planning Commission to permit the seven-story building, but had not received approval, according to the Nashville Post. Proffitt Dixon officials could not be reached for comment, the Nashville Post reported.
Elsewhere, Nashville's Bonus Height Program, adopted alongside the Downtown Code in 2010, lets developers earn additional height beyond what zoning allows by right in exchange for design elements that provide public benefits, according to The Tennessean.
Project Design
Nashvegas.com, citing Metro records, identifies the architects as Nashville-based EOA Architects and Charlotte-based Axiom Architecture.
Proffitt Dixon Partners' own description of the project, posted on the company's website, says Ferra is planned to combine apartment homes, ground-floor retail and live/work spaces, with outdoor dining terraces, public gathering spaces and an elevated amenity deck featuring a pool, spa and outdoor courts.
Timeline and Nearby Projects
Nashvegas.com reports that Proffitt Dixon is targeting a second-quarter 2027 groundbreaking, with Ferra expected to be completed in spring 2028. The company is also preparing a second phase of its Germantown development near First Horizon Park, according to the Nashville Business Journal, which reports that phase is slated to feature a rooftop pool and a restaurant along the greenway — echoing amenities planned for the Second Avenue site.
The North Capitol area has drawn other developers eager to be near the ballpark. Atlanta-based Portman Residential broke ground on a separate mixed-use project on North Capitol property that hugs First Horizon Park, Nashville Post previously reported. That project was another development along the same corridor.









