Nashville/ Community & Society

East Nashville Church Holds Final Service at Warner Arts Magnet More Than Six Years After EF3 Tornado

AI Assisted Icon
Published on November 25, 2026
East Nashville Church Holds Final Service at Warner Arts Magnet More Than Six Years After EF3 TornadoSource: Google Street View

Members of East End United Methodist Church held their final service at Warner Arts Magnet on Nov. 22, more than six years after an EF3 tornado tore through their Holly Street home in East Nashville. The congregation now hopes to begin worshiping in the Tulip Street sanctuary permanently by Dec. 20, closing out a long and costly chapter that sent members scattering between parks, borrowed spaces, and an elementary school auditorium.

A Tornado That Leveled a Historic Home

The March 3, 2020, tornado rated as an EF3 destroyed both East End United Methodist Church on Holly Street and congregant Victoria Banks’s family home, according to WKRN News 2. For more than six years afterward, members worshiped wherever they could find space, the station reports. Earlier reporting from WKRN had quoted Pastor Scott Marshall-Kimball explaining that engineers and architects determined the structure was too far gone, saying the structure was just too unstable to be able to save it.

That earlier coverage also noted the congregation’s hope that any replacement building would look strikingly similar, especially with the front façade of the church, and would salvage as much of the original structure as possible. Rather than rebuild from scratch on Holly Street, the congregation ultimately turned toward a different historic building altogether.

A New Home With Its Own History

East End United Methodist Church is renovating the former home of Tulip Street United Methodist Church, located at 518 Russell St. in East Nashville, in a project estimated at $4.5 million, according to a report from nashvillepost.com. That building dates to 1893 and has endured its own share of fires and tornadoes over the decades, the station’s report notes. The congregation is now restoring the stained-glass-windowed sanctuary, a functioning pipe organ, and the building’s bells, which construction crews are repairing, per the same account.

Pastor Brandon Baxter said the congregation is bringing the historic building back to life, the station reports. Getting to this point was not simple or cheap: East End United Methodist Church members collected money to rebuild their historic facility, but the project faced delays attributed to the Federal Emergency Management Agency and ran into fundraising setbacks along the way, according to the article.

Closing a Multimillion-Dollar Funding Gap

The church was short of rebuilding funds by roughly $8 million to $10 million, the station’s report states, a gap that forced Baxter and the congregation to explore other avenues to get the project across the finish line. The shortfall echoes an earlier 2021 effort, when nashvillepost.com reported that officials had enlisted three local companies to evaluate how to proceed following the tornado, with a 2021 construction start eyed at the time. That same 2021 reporting noted the rebuild was not expected to precisely replicate the church’s prior design, given accessibility, vehicle access, energy-efficiency, and technology requirements.

More than six years after the storm first forced the congregation out of its sanctuary, the Nov. 22 final service at Warner Arts Magnet marked a visible turning point. With Dec. 20 now set as the hoped-for date for permanent worship in the Tulip Street building, the congregation that once gathered in parks and school auditoriums is poised to settle into a sanctuary with its own century-plus of survival behind it.